Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

If the user wants to take full advantage of the additional features offered by Digizuite when working with the images in the Adobe CC products, it is possible to upload new assets into the DAM directly through the Adobe CC Connector.  

...

  Upload from disk

...

Users can upload any file from their computers by pressing the Upload from disk button. This will bring forth the upload dialog box. After finding and selecting the files, clicking Open will start the upload process. 

...

Once the upload is finished, it will result in the appropriate message at the bottom of the application.

...

Upload active document

...

It is possible to upload the active document. as well as drag and drop upload is using the same approach as Media Manager.

Info

See MM Uploadfor documentation

Things to be aware of

Info

Adobe products cannot have broken, local or embedded links in the document, if the user wishes to upload the active document. (See section “Link Manager“ to resolve the issue(s))

...

Upload active document

...


To upload a new document to the DAM, click the menu icon and then select ‘Upload document’.

The document must be saved before it can be uploaded. A prompt will be shown, if this is not the case.

...

There are two options available:

  1. Uploading the document as a new asset in Digizuite

  2. Replacing the existing asset, if the document is already an existing asset in Digizuite.

...

When the document has been uploaded, it can be seen as one of the assets.

...

Info

Adobe products which has the Link Manager (After Effects, InDesign and Premiere Pro) cannot have broken or local links in the document if they wish to upload the active document. (See section “Link Manager“ to resolve this issue)

...

Replace an active document

To replace the document, the active document must already have been uploaded to the DAM, just like in the first place and the prompt will be shown, if this condition hasn’t been met..

This time, the user should select the second option: ‘Replace asset’.

...

When the ‘Replace asset’ button has been clicked, the user is notified with the following confirmation:

...

When the document has been replaced, it can be seen in the asset list with the changes.